Uploaded image for project: 'A/B Testing'
  1. A/B Testing
  2. ABTEST-220

Change the name of the results tab as its in the mockups

    XMLWordPrintable

Details

    • Task
    • Resolution: Fixed
    • Neutral
    • 1.0
    • None
    • None
    • Add-Ons 42
    • 0.5

    Description

      AC

      • Change label of the 'Result' tab

      Checklists

        Acceptance criteria

        Attachments

          Issue Links

            Activity

              People

                chuong.doan Chuong Doan Huy
                ilgun Ilgun Ilgun
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Checklists

                    Task DoR

                    Time Tracking

                      Estimated:
                      Original Estimate - Not Specified
                      Not Specified
                      Remaining:
                      Remaining Estimate - 0d
                      0d
                      Logged:
                      Time Spent - 2.5h
                      2.5h