Uploaded image for project: 'Build'
  1. Build
  2. BUILD-533

Run the UI tests with the BOM update suggested by the dependency bot

XMLWordPrintable

    • Icon: Improvement Improvement
    • Resolution: Fixed
    • Icon: Neutral Neutral
    • None
    • None
    • None

      Although we still foresee some level of manual testing (e.g. the Groovy unit tests should be run after a Groovy upgrade), one time-consuming part of bumping a dependency is making sure the UI tests run. This could be achieved by the bot because it's only a matter of building boms, main, UI, CE & dx-core in sequence.

      While doing this, we should make sure to not pollute the Maven repositories by either:

      • using a temporary version (ticket suffix)
      • or staging repos

        Acceptance criteria

              mmichel Maxime Michel
              mmichel Maxime Michel
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved:

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - Not Specified
                  Not Specified
                  Logged:
                  Time Spent - 1.5h
                  1.5h