XMLWordPrintable

Details

    • Task
    • Resolution: Fixed
    • Neutral
    • 2.0
    • 2.0
    • None
    • Scrum Sprint 7

    Description

      Here is a non exhaustive list of what we need to amend before release any stable version:

      1. The complexity of many methods are a way to high 
      2. We should not throw RuntimeException or Exception directly, we should create our own exception
      3. We miss code comment and java doc comment on most methods (whit the right number of @param attributes)
      4. We need to remove all the FIXME and TODO
      5. We need to remove the e.printStackTrace()
      6. We should use Objects.equals() whenever we want to check whether 2 objects are equal
      7. We should remove all the string concatenation and replace them with StringBuilder of String.format()
      8. We need to simplify our if statements
      9. We need to externalise the duplicate code
      10. We need to cover the code with unit test

      Checklists

        Acceptance criteria

        Attachments

          Activity

            People

              trung.luu Trung Luu
              amanzoni Adrien Manzoni
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Checklists

                  Task DoR

                  Time Tracking

                    Estimated:
                    Original Estimate - 3d
                    3d
                    Remaining:
                    Remaining Estimate - 0d
                    0d
                    Logged:
                    Time Spent - 3d
                    3d