Uploaded image for project: 'Backup'
  1. Backup
  2. MGNLBACKUP-121

Scheduled task description is incorrect

    XMLWordPrintable

Details

    • Task
    • Resolution: Obsolete
    • Neutral
    • None
    • 2.2.2
    • None
    • 1

    Description

      See screenshot. The word 'at' should only be shown once. Logic should be applied to ExistingTasksField to not show anything if the task is enabled.

      Checklists

        Acceptance criteria

        Attachments

          Activity

            People

              Unassigned Unassigned
              mmichel Maxime Michel
              Nucleus
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Checklists

                  Task DoR