[MGNLSCH-53] Scheduler does not release its running jobs on shutdown Created: 30/Jan/15  Updated: 19/May/22  Resolved: 19/May/22

Status: Closed
Project: Scheduler
Component/s: None
Affects Version/s: 2.1.2
Fix Version/s: None

Type: Bug Priority: Major
Reporter: Jaroslav Simak Assignee: Unassigned
Resolution: Won't Do Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Template:
Acceptance criteria:
Empty
Task DoD:
[ ]* Doc/release notes changes? Comment present?
[ ]* Downstream builds green?
[ ]* Solution information and context easily available?
[ ]* Tests
[ ]* FixVersion filled and not yet released
[ ]  Architecture Decision Record (ADR)
Bug DoR:
[ ]* Steps to reproduce, expected, and actual results filled
[ ]* Affected version filled
Date of First Response:

 Description   

When fixing MGNLRSSAGG-188 i've run into issues with scheduled jobs that were not stopped and Magnolia instance couldn't be shut down properly.

This is probably due to scheduler.shutdown(true); in stop() method in SchedulerModule class. Here is part of the javadoc of shutdown method:

 * @param waitForJobsToComplete
 *          if <code>true</code> the scheduler will not allow this method
 *          to return until all currently executing jobs have completed.


 Comments   
Comment by Roman Kovařík [ 19/May/22 ]

Hello,

This ticket is now marked as closed due to one of the following reasons:

  • A long period of inactivity
  • Uses an old or Beta version of an application, module, or framework that we no longer support
  • The issue is no longer reproducible or has been fixed in later versions

If you are still facing a problem or consider this issue still relevant, please feel free to re-open the ticket and we will reach out to you.

Thank you,
The Magnolia Team

Generated at Mon Feb 12 10:45:26 CET 2024 using Jira 9.4.2#940002-sha1:46d1a51de284217efdcb32434eab47a99af2938b.