Uploaded image for project: 'Magnolia Workflow Module'
  1. Magnolia Workflow Module
  2. MGNLWORKFLOW-340

UI quirks due to Scheduled tab

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Obsolete
    • Icon: Neutral Neutral
    • None
    • 5.4.9, 5.5
    • None

      See attached screenshot.

      • after the All tasks tab a vertical line is slightly visible
      • the Group by type checkbox slides down and is misaligned compared to the checkboxes below
      • if a scheduled task is present I believe its counter style should be like the Assigned one (not green)

        Acceptance criteria

          1. ui-quirks.png
            301 kB
            Federico Grilli

              Unassigned Unassigned
              fgrilli Federico Grilli
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved:

                  Bug DoR
                  Task DoD